Skip navigation links
Broward Home
Commission
Living
Doing Business
Visiting
Employees
Skip navigation links
Customer Service
Neighborhood Improvement Program
Lighthouse Point Construction Projects
Rates and Fees
Water Management
Water & Wastewater Engineering
Industrial Pretreatment Program
WWS Minimum Design and Construction Standards
WWS Land Development
WWS Capital Construction Projects
WWS Utility Connection Permit
Utility Analysis Zone (UAZ)
WWS Utility Connection Permit
Broward County > Water Services > WWS Utility Connection Permit

This webpage contains information on the Water and Wastewater Services (WWS) Utility Connection Permit (UCP). The UCP is the process by which WWS allows connection to or modification of its potable water, wastewater and/or reclaimed water systems. Installation or modification of water mains, fire protection double detector checks, fire hydrants, gravity sewer mains, force mains, lift stations, pump stations and sewer laterals almost always require a UCP. Installation of small diameter water services to a single building usually does not require a UCP.

Click here to determine if a property is within a WWS jurisdictional area. Click here for information on WWS design and construction standards. Click here for information on WWS land development standards.

The UCP permit process is a four step (part) process. Click here for more information.

The following documents and forms are associated with the four parts of the UCP. They are applicable to either the paper-based or ePermit method of obtaining a UCP.

All linked documents and forms are in Adobe PDF format.


PART 1 – PLAN APPROVAL
Application for Plan Review Form and Instructions

Example UCP Project Design Drawings

Sample Fire Protection Level of Service – Fire Marshal or Fire Protection Specialist Letter

Sample Fire Protection Level of Service – Engineer of Record Letter

Sample Hydrant Location Letter


PART 2 – REQUEST FOR PERMIT
Application for Connection Construction (Corporation) Form and Instructions

Application for Connection Construction (Governmental Agency) Form and Instructions

Application for Connection Construction (Individual) Form and Instructions

Application for Connection Construction (Partnership) Form and Instructions


PART 3 – THE PERMIT
Connection Construction Approval (Issued by WWS)


PART 4 – RELEASE FOR SERVICE
Application for Release for Service Form and Instructions

Guideline for Partial Release of UCP Projects

Release for Service Forms


Switch to Full Site   | Terms of use
Official Mobile Website of Broward County, Florida
The version of this site is best viewed on a mobile device.